Aroko

ISSUE 002 · The Aroko Letter

A Tale of Two Grids

Energy transition and geopolitics collide on the same wires

MAR 25, 20269 min readPrimary-source verified
ENERGY TRANSITIONGEOPOLITICS

An early look at how energy-transition politics and geopolitical risk compete for the same limited grid capacity — the seam the Letter has kept returning to ever since.

Key takeaways

READ THE FULL ISSUE Published in full, free, on Beehiiv.

Forecasts this issue put on the watchlist

Open Grid Connections & Local Approval
PUC exit fee dockets in Virginia, Texas, Georgia, and Ohio.
Quarterly
Open Grid Connections & Local Approval
FERC gas lateral permitting timelines.
Quarterly
Open Power Equipment
GE Vernova / Siemens equipment backlog.
Quarterly earnings
Open Power Equipment
Hyperscaler CCS / SMR milestones — Google's Broadwing CCS and Amazon's X-Energy SMR.
Semi-annually
Resolved: held Financing
OBBBA safe-harbor project starts ahead of the July 2026 cutoff.
Monthly through July 2026
Open Grid Connections & Local Approval
Behind-the-meter vs. grid-tied capacity ratio (EIA Form 860).
Quarterly, EIA Form 860

The Aroko Letter

Free. Biweekly. No sponsored research. Every forecast tracked in public with its kill condition attached.

GET THE LETTER