Behind-the-meter vs. grid-tied capacity ratio (EIA Form 860).

Open

Chokepoint
Grid Connections & Local Approval — Interconnection queues, siting fights, and the regulatory dockets (FERC, state PUCs, SCCs) that decide them. (Mostly price, occasionally an outright no)
Kill condition
The single best measure of defection pace — no baseline exists yet.
Horizon
Quarterly, EIA Form 860
Source
Issue 2 — A Tale of Two Grids · full issue

Why it is on the watchlist

The behind-the-meter versus grid-tied capacity ratio is the single best measure of defection pace — once a baseline exists in the EIA data.

How Aroko tracks forecasts

Every item is reproduced from a published issue with its original kill condition intact. Status changes only on dated, citable evidence that meets that condition, reviewed weekly. Nothing is resolved in hindsight to improve the record.