Behind-the-meter vs. grid-tied capacity ratio (EIA Form 860).
Open
- Chokepoint
- Grid Connections & Local Approval — Interconnection queues, siting fights, and the regulatory dockets (FERC, state PUCs, SCCs) that decide them. (Mostly price, occasionally an outright no)
- Kill condition
- The single best measure of defection pace — no baseline exists yet.
- Horizon
- Quarterly, EIA Form 860
- Source
- Issue 2 — A Tale of Two Grids · full issue
Why it is on the watchlist
The behind-the-meter versus grid-tied capacity ratio is the single best measure of defection pace — once a baseline exists in the EIA data.
How Aroko tracks forecasts
Every item is reproduced from a published issue with its original kill condition intact. Status changes only on dated, citable evidence that meets that condition, reviewed weekly. Nothing is resolved in hindsight to improve the record.
Get the next forecast when it is published
Free. Biweekly. No sponsored research. Every forecast tracked in public with its kill condition attached.