PUC exit fee dockets in Virginia, Texas, Georgia, and Ohio.

Open

Chokepoint
Grid Connections & Local Approval — Interconnection queues, siting fights, and the regulatory dockets (FERC, state PUCs, SCCs) that decide them. (Mostly price, occasionally an outright no)
Kill condition
If exit fees reach grid-cost parity, the defection to behind-the-meter power slows.
Horizon
Quarterly
Source
Issue 2 — A Tale of Two Grids · full issue

Why it is on the watchlist

If PUC exit fees reach parity with grid costs, the economics of defecting to behind-the-meter power stop working.

How Aroko tracks forecasts

Every item is reproduced from a published issue with its original kill condition intact. Status changes only on dated, citable evidence that meets that condition, reviewed weekly. Nothing is resolved in hindsight to improve the record.